House Stuff Part 2
Here's an updated list in the past week or so.
Completed in last week or so All but 2 pieces of basement trim painted One corner of the basement trim installed Upstairs bathrooms painted Upstairs cabinetry and trim painted (except for several added items) East half of basement electrical fixtures replaced West half of basement electrical fixtures mostly pulled out West half of basement floor 90% done (I hope to complete it tomorrow) Some of the stuff has been moved back into place, and one corner of the room is actually essentially back to the way it will be.
Still To do list Stain remaining items for bathrooms Re-clean east end floor after painting Install trim in basement Paint trim around doors Replace mantel shelf Get countertop for washroom Install basement cabinet Clean west end of basement Stain west end of basement Paint ceiling and walls of west end of basement Miter and install trim (some mitered and installed, will probably take 2 hours total when the rest of the room is painted) Paint north wall of stair well Clean house for crashers for the Scribal Symposium Finish creating the workshop for the Symposium
If things go well, I will finish scraping the floor tomorrow. What will almost assuredly happen is that at some point on Sunday, if I don't finish tomorrow, I'm going to say "fuck it" and just start the remaining steps of the process. If I finish tomorrow, it will go something like this:
Saturday: Clean floor with TSP cleaner Sunday: Stain the floor, stain the remaining bathroom items Monday: Clean the excess stain, prime paneling on north stairwell wall, put on first coat Tuesday: Apply topcoat to floor Wednesday: Apply primer to remaining basement paneling and paint first coat Thursday/Friday: Paint second coat in both basement and stairwell
If I don't get it clean tomorrow then this will move back a day, but hopefully by the end of next week the big parts of the process will be done downstairs plus both bathrooms upstairs should be completed by the end of next week. I have plans to do a little work on the downstairs bathroom, but I'm sort of doubting that will happen prior to Symposium.
Anyway, progress is progressing